CardioNet project realization plan

Year

Stages/ Activities

Activity category according to the state help scheme Executing organisation Deadlines Results / Results presentation documents

Necessary financial resources

(Amount in lei)

Total

From which

Funding from the Program's budget

4

Funding from other sources (co-funding)

2007

Stage I Interdisciplinary study of the current stage of development of the field and definition of the system's model   Total stage

15.12.2007

Dictionaries, electronic files models, system process models, research report, reporting documentation

122,500

122,500

0

UTCN

36,063

36,063

 

UMF-MV

28,175

28,175

 

CIA-SA

37,975

37,975

 

IOCN

6,125

6,125

 

SM-P

3,062

3,062

 

UB

11,100

11,100

 

  Activity I.1 Study of the national and international standards, focused on the selected cardio- vascular diseases and on the similar telecardiology projects A.2.1 Industrial research / Studies, analysis Total action   Interdisciplinary study, dictionaries and electronic files models

41,287

41,287

0

UTCN

12,000

12,000

UMF-MV

9,000

9,000

IOCN

6,125

6,125

SM-P

3,062

3,062

UB

11,100

11,100

  Activity I.2 Conceptual inclusion and exclusion models, establishing the IT technologies for modeling and controlling the project-specific processes. A.1.2 Fundamental research / Elaboration of the conceptual models Total action   Conceptual models / Specific documentation

41,000

41,000

0

UTCN

12,000

12,000

UMF-MV

9,000

9,000

CIA-SA

20,000

20,000

  Activity I.3 Defining the conceptual system model. Defining the roles of the participants to the processing flow. A.1.2 Fundamental research / Elaboration of conceptual models Total action   System model / Reporting documents

40,213

40,213

0

UTCN

12,063

12,063

UMF-MV

10,175

10,175

CIA-SA

17,975

17,975

2008

Stage II Elaboration of the solution proposed for the pilot system using integrated IT components   Total stage

30.09.2008

Data models, tables, relationships, diagrams, ontologies, scientific papers, web services, methodologies, technical reports.

613,750

603,750

10,000

UTCN

196,219

196,219

 
UMF-MV

138,863

138,863

 
CIA-SA

197,162

187,162

10,000

IOCN

30,187

30,187

 
SM-P

15,094

15,094

 
UB

36,225

36,225

 
  Activity II.1 Study and design of the data models. Realization of the electronic files. Acquisition of specific equipment A.2.4 Industrial research / Design of the experimental model Total action   Defining models and data structures / Specific documentation

104,000

104,000

0

UTCN

50,000

50,000

 
UMF-MV

35,000

35,000

 
IOCN

6,000

6,000

 
SM-P

3,000

3,000

 
UB

10,000

10,000

 
  Activity II.2 Study and modeling of the domain's ontology and of the databases related to standards, policies and specific templates (EKG, optimal coagulation therapeutic interval,…) A.1.2 Fundamental research / Elaboration of conceptual models Total action   Ontology model / Specific documentation

260,162

260,162

0

UTCN

60,000

60,000

 
UMF-MV

33,000

33,000

 
CIA-SA

147,162

147,162

 
IOCN

8,000

8,000

 
SM-P

4,000

4,000

 
UB

8,000

8,000

 
  Activity II.3 Design of the data acquisition system and methodologies for processing data related to inclusion / exclusion A.2.4 Industrial research / Experimental model design Total action   Model of a data acquisition system and methodologies for information processing / Documentation of the system's specification

153,000

143,000

10,000

UTCN

45,000

45,000

 
UMF-MV

35,000

35,000

 
CIA-SA

50,000

40,000

10,000

IOCN

8,000

8,000

 
SM-P

5,000

5,000

 
UB

10,000

10,000

 
  Activity II.4 Building the patients' groups and the criteria for directing them towards the three levels of the system (primary – family physician, secondary and tertiary). Defining specialized web services. Infrastructure finalization. A.2.7 Industrial research / Demonstration of the model's functionality Total action   Defining the patients' classification criteria, Defining specialized web services.

96,588

96,588

0

UTCN

41,219

41,219

 
UMF-MV

35,863

35,863

 
IOCN

8,187

8,187

 
SM-P

3,094

3,094

 
UB

8,225

8,225

 

2009

Stage III Implementation, testing of the solution and recording current data in the pilot system   Total stage

15.06.2009

Acquisition system, data warehouses, web services, message protocols, Portal, Technical reports, Papers

613,751

593,751

20,000

UTCN

196,719

196,719

 
UMF-MV

136,562

136,562

 
CIA-SA

204,063

184,063

20,000

IOCN

29,688

29,688

 
SM-P

14,844

14,844

 
UB

31,875

31,875

 
  Activity III.1 Defining the domain's ontology and the system's databases, access policies, security, confidentiality and completion of specific templates. A.1.2 Fundamental research / Elaboration of conceptual models Total action   Defining ontology and the databases / Specific documentation

184,063

184,063

0

UTCN

50,000

50,000

 
UMF-MV

30,000

30,000

 
CIA-SA

104,063

104,063

 
  Activity III.2 Realizing an acquisition and processing system, testing of the associated databases. Elaborating web services and messages protocol. Data acquisition. A.2.5 Industrial research / Experimental model realization Total action   Data acquisition system / Documentation for experimental data acquisition

248,875

228,875

20,000

UTCN

60,000

60,000

 
UMF-MV

35,000

35,000

 
CIA-SA

100,000

80,000

20,000

IOCN

15,000

15,000

 
SM-P

7,000

7,000

 
UB

31,875

31,875

 
  Activity III.3 Analysis of the data acquired after the investigations and treatments, creating the specialized web services for specific processing and of the system's portal A.3.6 Experimental development / Product experimentation and verification Total action   Data processing reports and system's portal

97,532

97,532

0

UTCN

45,000

45,000

 
UMF-MV

30,000

30,000

 
IOCN

14,688

14,688

 
SM-P

7,844

7,844

 
  Activity III.4 - Partial results dissemination. Consortium coordination and reporting documents elaboration. Equipments acquisition. A.3.1, A.3.3 Experimental development Total action   Scientific papers, reporting documentation

83,281

83,281

0

UTCN

41,719

41,719

 
UMF-MV

41,562

41,562

 

2009

Stage IV Processing modules integration, optimization and testing of the system's functionalities. Current data acquisition, extension of the study group.   Total stage

15.12.2009

Methodologies, scientific papers, validation tests, integrated system, technical reports, stage documentation

382,499

362,499

20,000

UTCN

117,812

117,812

 
UMF-MV

83,375

83,375

 
CIA-SA

132,375

112,375

20,000

IOCN

18,125

18,125

 
SM-P

9,062

9,062

 
UB

21,750

21,750

 
  Activity IV.1 Validation and optimization of the inclusion methods, of the analysis methods, of the patients flow and of the data acquisition methods A.1.1 Fundamental research / Hypothesis verification Total action   Inclusion methodology / documentation

101,375

101,375

0

UTCN

40,000

40,000

 
UMF-MV

20,000

20,000

 
CIA-SA

32,375

32,375

 
IOCN

9,000

9,000

 
  Activity IV.2 Integration of the system's components for the defined infrastructure. Finalizing the access, security and confidentiality solutions. A.2.5 Industrial research / Experimental model realization Total action   Integrated acquisition and processing system / Specific documentation

97,000

87,000

10,000

UTCN

30,000

30,000

 
UMF-MV

17,000

17,000

 
CIA-SA

50,000

40,000

10,000

  Activity IV.3 - Elaboration and validation of the integration tests A.2.7 Industrial research / Demonstration of the model's functionality Total action   Integration tests results

134,937

124,937

10,000

UTCN

20,000

20,000

 
UMF-MV

25,000

25,000

 
CIA-SA

50,000

40,000

10,000

IOCN

9,125

9,125

 
SM-P

9,062

9,062

 
UB

21,750

21,750

 
  Activity IV.4 Data analysis and dissemination of the projects' intermediary results A.2.7 Industrial research / Demonstration of the model's functionality Total action   Scientific papers, reporting documentation

49,187

49,187

0

UTCN

27,812

27,812

 
UMF-MV

21,375

21,375

 

2010

Stage V Evaluation of the medical, social, economic, and life quality impact. Interpretation and dissemination of the results   Total stage

30.08.2010

Functional system. Scientific papers. Technical reports, reporting documents

337,500

317,500

20,000

UTCN

103,187

103,187

 
UMF-MV

73,025

73,025

 
CIA-SA

118,425

98,425

20,000

IOCN

15,875

15,875

 
SM-P

7,938

7,938

 
UB

19,050

19,050

 
  Activity V.1 Continuous completion of the databases with the results of the current investigations. A.2.6 Industrial research / Model experimentation Total action   Populating the databases

55,700

55,700

0

UTCN

30,000

30,000

 
UMF-MV

16,000

16,000

 
IOCN

3,000

3,000

 
SM-P

1,700

1,700

 
UB

5,000

5,000

 
  Activity V.2 Verification and validation of the analysis hypothesis by executing utilization scenarios A.1.1 Fundamental research / Hypothesis verification Total action   Testing the system on diverse scenarios / Testing documentation

67,425

67,425

0

UTCN

20,000

20,000

 
UMF-MV

19,000

19,000

 
CIA-SA

18,425

18,425

 
IOCN

4,000

4,000

 
SM-P

2,000

2,000

 
UB

4,000

4,000

 
  Activity V.3 Evaluation of the results and predictive analysis. Conclusions on the system's quality and further optimizations A.2.6 Industrial research / Model experimentation Total action   Results evaluation report

94,000

84,000

10,000

UTCN

15,000

15,000

 
UMF-MV

18,000

18,000

 
CIA-SA

50,000

40,000

10,000

IOCN

4,000

4,000

 
SM-P

2,000

2,000

 
UB

5,000

5,000

 
  Activity V.4 Analysis and dissemination of the final results A.2.7 Industrial research / Demonstration of the model's functionality Total action   Project's final report, participation at specialized conferences

120,375

110,375

10,000

UTCN

38,187

38,187

 
UMF-MV

20,025

20,025

 
CIA-SA

50,000

40,000

10,000

IOCN

4,875

4,875

 
SM-P

2,238

2,238

 
UB

5,050

5,050